Digital Roads 2025
Contents |
[edit] Introduction
On 2 September 2021, National Highways (formerly Highways England) launched Digital Roads 2025, through which they will work with tech partners to adopt digital technologies for the move to electric, connected and autonomous vehicles.
[edit] Initial components of the programme
Digital Roads 2025 includes initiatives that will work together to predict road maintenance requirements and improve the efficiency of repairs.
One component is a virtual twin of the road network that will see drawings and static models replaced with live, digital versions that can identify when maintenance is needed.
The work is being undertaken with assistance from UK Research and Innovation (UKRI), Engineering and Physical Sciences Research Council (EPSRC), the EU MSCA COFUND programme, construction and engineering company Costain and the University of Cambridge. Funds for the system are coming from two grants: the £8.6 million EPSRC Digital Roads Prosperity Partnership grant and the £6 million EU MSCA COFUND Future Roads Fellowships programme.
Intelligent road materials are also part of the programme. Once incorporated into existing road surfaces, these materials will be able to combine ‘live’ data with a digital twinning system that visualises the road and its condition. This technology will make it possible to identify when maintenance work is needed and will allow roads to repair themselves using self-healing technology.
Also in use or being developed are connected and autonomous plant, off-site fabrication and modular construction methods. It is hoped tthese systems could reduce scheme delivery times by up to 50% while limiting disruption (and increasing safety) for drivers and cutting the associated carbon emissions by around 50%.
[edit] Data driven networks
Network operation is becoming more automated and data driven. The use of technology - such as sensors - enables National Highways to pre-empt situations rather than just respond to them. This includes forecasting and adjusting conditions to respond to traffic levels, weather and environmental conditions.
Communication with drivers is also improving, ensuring that accurate information is available to help plan journeys through digital channels. Longer term, the deployment of connected and autonomous vehicles is expected to improve traffic flow and reduce incidents by up to 90%.
[edit] Looking beyond 2025
In development for 2050 and beyond are freight platooning, personalised in-vehicle messaging (as well as vehicles sharing data) and roads that relay information without the use of traditional signage. Additional financial resources will be provided through the Innovation and Modernisation designated fund.
[edit] Related articles on Designing Buildings
- Defining the digital twin: seven essential steps.
- Digital twin.
- Five years of road investment strategy.
- Government construction and infrastructure pipelines.
- Highways England.
- How can infrastructure be retrofitted in the digital age?
- How to keep roads future-proof.
- Road investment strategy.
- Smart motorways procurement plan.
- What a digital twin could be.
[edit] External resources
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.